  • Kellogg Project Montrose, Process Installation

Kellogg Project Montrose, Process Installation

Belleville, Ontario

Crossey Engineering provided the mechanical design for Phase 6 of the design build expansion at the Kellogg Belleville production plant.

Designs for the 125,000 sq. ft. factory included: Process piping drawings for equipment connection from the main piping header (plan, elevation, section, and detail), implementation of chilled and cold water, hot water, compressed air, steam, condensate, natural gas, hydraulic, mill water, sugar, wheat, frosting, flavour, sorbitol, vitamins, and drainage.

The approximate construction cost was $72 million.

  • Complete: 2007