| Canadore College/Nipissing University, Library, North Bay |
|
Working with the design group Crossey Engineering Ltd. has developed a conceptual design to meet LEED Silver. CEL has lead the energy analysis simulations and incorporated, high efficiency lighting, condensing boilers, in-floor heating and cooling, heat recovery on exhaust air, demand ventilation, day lighting, and an efficient building envelope. Energy simulations show a 45% efficiency beyond the requirements of the National Energy Code. Project Cost: $16.5 Million Size: 57,800 sq.ft. (5200 sq.m) Completion: 2008 Architect: Diamond and Schmitt Architects
|
|
|
|
 |
|
| |
| |
|
| |
|