Kellogg Project Montrose, Process Installation, Belleville

Crossey Engineering provided the Mechanical design and engineering for Phase "Bolt on #6", for the 125,000 sq.ft. design build expansion of the Kellogg Belleville production plant.

Services designed included:  process piping working drawings for  equipment connection from the main piping header (plan, elevation, section and detail), which includes chilled water, cold water, hot water, compressed air, steam, condensate, natural gas, hydraulic, mill water, sugar, wheat, frosting, colour, flavour, sorbitol, vitamin and drain.

Size of Facility:  125,000 Sq.Ft.

Construction Cost: $72 Million; (M $8 Million)

Completion Date: December, 2007


 
 
©2008 - 2012 CEL. All rights reserved.
Designed by koredesign.com